Project: Logan WTP Sludge Loading Facility
Location: Logan Water Treatment Plant
Client: Thiess Environmental
Scope of Work: Design, construct, commission and maintain 75 tonne sludge loading facility
Value: $150,000
Challenges: To find a company with the capacity and experience to build a 75 tonne sludge loading facility and who would be able to maintain the finished product
Engineering Solutions: HVAC was able to demonstrate the ability to provide a turnkey solution, interfacing with existing facilities and controls and the maintaining the infrastructure post project completion